Two Pumps In One Facility Arrangement
The report identifies two DHBT40 units serving the wider construction scope. Their deployment should be read in the context of the facility, not as a universal fleet recommendation.

The report identifies two DHBT40 units serving the wider construction scope. Their deployment should be read in the context of the facility, not as a universal fleet recommendation.
The YHZM35 provides the reported concrete source; the pumps move prepared concrete toward the placing areas. The supply rhythm and complete line route remain essential selection inputs.
DHBT40 is kept separate from the larger DHBT60 configurations in the catalogue. Request its own proposal and configuration details.
Review DHBT40The associated plant report identifies the YHZM35 concrete production arrangement for the same facility.
Read The Production StoryThese two reports describe one project. Equipment quantities and configuration references come from the published EPDAS reports.

Identify the plant, mixer or truck-delivery arrangement and expected arrival rhythm.
Record horizontal sections, elevation, bends and the planned placing sequence.
Provide power availability, access, setup space and crew arrangements.