30T
A smaller storage reference for a focused supply plan.
Explore 30TDiscuss silo capacity, transport and support arrangements as part of your complete plant. Filling, discharge and monitoring equipment should match the selected configuration.

It stores compatible dry powder and feeds the production system through matched discharge equipment. Used to maintain material inventory at concrete plants.
Images show an equipment configuration. Specifications and included equipment depend on the selected model and quotation.
Cement and compatible powder storage for concrete production.
Required capacity, stored material, filling method, site conditions and transport constraints.
Open a model to explore its specific strengths, published configuration and project fit.
A smaller storage reference for a focused supply plan.
Explore 30TCement storage for JS500 and JS750 references.
Explore 50TIncrease storage while retaining the 3 m diameter reference.
Explore 80TA 100 t storage option for a wider mixer range.
Explore 100TPlan around 150 t inventory with a confirmed drawing.
Explore 150TA 4.5 m diameter reference for larger inventory.
Explore 200TMore inventory within the listed 4.5 m diameter class.
Explore 300TThe largest storage size in the current silo table.
Explore 500TScroll horizontally to compare all specifications.
| Capacity | Silo diameter | Silo body height | Total height | Mixer reference | Screw diameter reference |
|---|---|---|---|---|---|
| 30T | Φ3m | 4.8m | 11.4m | JD350 | Φ140/Φ168 |
| 50T | Φ3m | 5.4m | 12m | JS500/JS750 | Φ168/Φ219 |
| 80T | Φ3m | 9m | 15.6m | JS750/JS1000 | Φ219 |
| 100T | Φ3m | 11.4m | 18m | JS1000-JS2000 | Φ219/Φ273 |
| 150T | Φ3.3m | Confirm drawing | Confirm drawing | JS1000-JS3000 | Φ273 |
| 200T | Φ4.5m | 18.6m | 25.2m | JS1500-JS3500 | Φ273/Φ323 |
| 300T | Φ4.5m | 24.6m | 29.5m | JS2000-JS4000 | Φ323/Φ407 |
| 500T | Φ6M | 22.2m | 28.8m | JS3000-JS6000 | Φ407 |
Published EPDAS specifications are a reference for equipment selection. Final specifications and included equipment are confirmed in the quotation.
EPDAS product referenceUse daily cement consumption and replenishment frequency to plan storage, allowing for delivery timing and the usable capacity of the selected silo.
No. Each arrangement needs its own drawing, support requirements, transport plan and filling/discharge connections. Request a drawing for the exact silo.
Compare expected consumption with delivery frequency. Nominal storage capacity and operationally available inventory serve different planning purposes.
Check tanker access, filling connections, venting, level indication and discharge equipment for the exact silo arrangement.
Vertical and horizontal designs need their own drawings and support assessment. Confirm transport, lifting and access before installation.
Coordinate material feed and connection dimensions with the receiving plant.
Explore Screw ConveyorDiscuss how the available cement supply enters the selected storage system.
Explore Cement FeederFunctional schematic for selection. It is not a dimensional drawing or a confirmation of items included in the quotation.
The incoming powder or storage connection.
Cement Silo selected for the transfer or storage duty.
The receiving conveyor, scale or process interface.
| Configuration area | Reference scope | Options / confirmation |
|---|---|---|
| Core equipment | Cement Silo and its published configuration. | Approve the exact model, component list and duty before order. |
| Supporting systems | Storage, feeding and receiving interfaces. | Confirm what is supplied, optional or provided by the buyer. |
| Custom / private label | Custom configuration and branding discussions are supported. | Agree artwork, colours, markings, electrical requirements and documentation scope. |
Request dimensions, module weights, support layout, working clearances and utility connections for the selected configuration. Final transport and lifting plans follow the approved equipment scope.
Request Engineering DocumentsRequest available model-specific operation footage, factory inspection information and the proposed acceptance checklist. Agree the identification and records required for your procurement process.
Discuss Inspection RequirementsReview published model references before requesting the detailed technical pack.
Download CSV ↓