Silo storage sizes

150T Cement Silo

The 150 t silo occupies the next storage step above 100 t in the EPDAS table. A 3.3 m diameter and Φ273 screw reference are published for this size.

EPDAS Cement Silo series reference for 150T

Series rendering. Confirm 150T's appearance and included equipment in its proposal.

WHAT IS 150T?

Intermediate Inventory With Final Height To Be Confirmed

The 150T table publishes a 3.3 m diameter and a Φ273 conveyor association, but does not establish the final total height.

WHERE IT WORKS

Use this capacity class for inventory planning while obtaining the approved geometry before checking site clearances or structural supports.

01

150T Configuration

The source lists mixer associations from JS1000 to JS3000, making the receiving equipment an important part of selection.

02

150T Selection Detail

The larger inventory class gives another replenishment option when 100 t storage is insufficient.

150T / CONNECT THE EQUIPMENT

The 150T Equipment And Material Interfaces

Understand the role of each connection before building the equipment package.

  1. 01Incoming bulk cement transfer
  2. 02150T filling and storage
  3. 03Controlled powder discharge
  4. 04Matched conveyor and plant scale
Screw Conveyor series illustrationINTERFACE 01 / Screw Conveyor

Screw Conveyor / 150T

The listed Φ273 association does not provide all connection coordinates.

Confirm For 150T

Request the final vessel outlet and conveyor arrangement together.

Review Screw Conveyor
Stationary Concrete Batching Plant series illustrationINTERFACE 02 / Stationary Concrete Batching Plant

Stationary Concrete Batching Plant / 150T

JS1000–JS3000 mixer references cover a broad duty range.

Confirm For 150T

Size operational inventory from the actual cement demand and delivery plan.

Review Stationary Concrete Batching Plant
Foundation Free Concrete Batching Plant series illustrationINTERFACE 03 / Foundation Free Concrete Batching Plant

Foundation Free Concrete Batching Plant / 150T

The silo needs an assessed support structure separate from the plant's modular frame.

Confirm For 150T

Request its load information and final height.

Review Foundation Free Concrete Batching Plant
Cement Feeder series illustrationINTERFACE 04 / Cement Feeder

Cement Feeder / 150T

The filling proposal depends on the completed vessel drawing.

Confirm For 150T

Avoid fixing access or connection elevations from neighbouring silo sizes.

Review Cement Feeder

Options and alternative architectures are identified in each explanation. This is not a pre-approved matched package. Final connections, duty and supplied components require a model-specific technical review.

Review My Equipment Combination
150T / COMPONENT EXPLANATION

Exploded Functional Overview

Separate the key systems to see what each contributes to the operation.

01Support & discharge02Storage shell03Filling connection04Powder feed outlet

150T functional separation illustration. Blocks identify subsystem roles; they do not reproduce the machine geometry, assembly sequence or fastening details. Request the approved model drawing for engineering use.

Request The 150T Assembly Drawing
150T / PUBLISHED CONFIGURATION

Technical Data For 150T

Parameter150T
Silo diameterΦ3.3m
Silo body heightConfirm drawing
Total heightConfirm drawing
Mixer referenceJS1000-JS3000
Screw diameter referenceΦ273

Published EPDAS specifications are a reference for equipment selection. Final specifications and included equipment are confirmed in the quotation.

Original EPDAS Technical Reference ↗
A MODEL-SPECIFIC COMPARISON

Compare 150T With Nearby Configurations

Selection reference150T · This model100T200T
Silo diameterΦ3.3mΦ3mΦ4.5m
Silo body heightConfirm drawing11.4m18.6m
Total heightConfirm drawing18m25.2m
Mixer referenceJS1000-JS3000JS1000-JS2000JS1500-JS3500
Screw diameter referenceΦ273Φ219/Φ273Φ273/Φ323

Review 150 t against cement consumption and shipment timing; request the final height drawing before committing to site clearances.

PREPARE THE 150T PROPOSAL

Agree The Package And Site Interfaces

01

Silo diameter: Φ3.3m

02

Silo body height: Confirm drawing

03

Total height: Confirm drawing

Confirm core equipment, options, buyer-provided systems, transport modules, inspection documents and support responsibilities in the quotation.

Your Business Enquiry

* Required fields

EPDAS uses these details to respond to your equipment enquiry. For corrections or removal, contact info@epdas.com.

Discuss Your Project ↗