DJBT50-10-85
The highest pumping output in the mixer-pump table.
Explore DJBT50-10-85Combine concrete mixing and pipeline pumping in one setup. The published range includes diesel DJBT models and the electric EJBT30-08-37, with 450 L mixer volume per tank and model-specific theoretical pumping output.

It prepares concrete on site and pumps it through a pipeline. Used where both mixing and delivery are required at the work location.
Images show an equipment configuration. Specifications and included equipment depend on the selected model and quotation.
Small and medium construction projects needing both concrete preparation and pumping on site.
Required mixing output, concrete mix, power source, delivery height and horizontal route.
Open a model to explore its specific strengths, published configuration and project fit.
The highest pumping output in the mixer-pump table.
Explore DJBT50-10-85A 40 m³/h diesel pumping reference.
Explore DJBT40-10-82Diesel independence in the smaller pumping class.
Explore DJBT30-08-76An electric option for integrated mixing and pumping.
Explore EJBT30-08-37Scroll horizontally to compare all specifications.
| Parameter | DJBT50-10-85 | DJBT40-10-82 | DJBT30-08-76 | EJBT30-08-37 |
|---|---|---|---|---|
| Theoretical concrete pumping output | 48 m³/hr | 40 m³/hr | 32 m³/hr | 30 m³/hr |
| Maximum concrete pumping pressure (MPa) | 10 | 10 | 8 | 8 |
| Main engine | Diesel engine: YUCHAI 85KW | Diesel engine: WEIFANG 82KW | Diesel engine: WEIFANG 76KW | Electric motor: 37KW |
| Main oil pump | KAWASAKI 112 | KAWASAKI 112 | KAWASAKI 112 | JINDA |
| Main oil cylinder diameter/stroke | Φ100/800 mm | Φ100/800 mm | Φ90/580 mm | Φ90/580 mm |
| Concrete cylinder diameter / stroke (mm) | Φ180/800 | Φ180/800 | Φ180/580 mm | Φ180/580 mm |
| Theoretical pump distance | Height: 70 m Length: 250 m | Height: 60 m Length: 250 m | Height: 50 m Length: 200 m | Height: 50 m Length: 200 m |
| Hydraulic pump set | HUADE (CN) | HUADE (CN) | HUADE (CN) | HUADE (CN) |
| Hydraulic valve set | TAIFENG (CN) | TAIFENG (CN) | TAIFENG (CN) | TAIFENG (CN) |
| Lubricating system | Automatic hydraulic | Automatic hydraulic | Automatic hydraulic | Automatic hydraulic |
| Concrete mixer volume | 450L per tank | 450L per tank | 450L per tank | 450L per tank |
| Max. Aggregate size | 35 mm | 35 mm | 35 mm | 35 mm |
| Aggregate lifting volume | 500L per hopper | 500L per hopper | 500L per hopper | 500L per hopper |
| Concrete slump | 160-220 mm | 160-220 mm | 160-220 mm | 160-220 mm |
| Controller | Wireless / Cabinet-buttons | Wireless / Cabinet-buttons | Wireless / Cabinet-buttons | Wireless / Cabinet-buttons |
| Main electric components | CHINT (CN) | CHINT (CN) | CHINT (CN) | CHINT (CN) |
| Machine weight | 5400 kg | 5300 kg | 5200 kg | 5000 kg |
| Diameter of concrete pipe | Φ125 mm | Φ125 mm | Φ125 mm | Φ125 mm |
| Length of concrete pipe | 100 m | 100 m | 100 m | 100 m |
Published EPDAS specifications are a reference for equipment selection. Final specifications and included equipment are confirmed in the quotation. Pump output is not mixer production output. Vertical and horizontal pumping distances are separate reference limits and are not achieved simultaneously; results depend on concrete and pipeline conditions.
EPDAS product referenceNo. The table lists theoretical pumping output and mixer volume per tank. Effective combined production also depends on loading and mixing cycles.
No. They are separate reference limits. Share the complete pipe route, bends, height, concrete mix and target output so a suitable arrangement can be assessed.
The mixer has to be loaded and complete its mixing cycle before supplying the pump. Plan effective combined production around both activities.
Record aggregate size, workability, vertical lift, horizontal run and bends. Those conditions determine whether a proposed pumping arrangement is suitable.
Leave space for material loading, pipeline connection, cleaning and routine inspection. Position the machine to suit the sequence of the pour.
A trailer concrete pump is worth reviewing if concrete is already available from another source.
Explore Trailer Concrete PumpA mobile plant offers another supply arrangement when the project needs a dedicated batching operation.
Explore Mobile Concrete Batching PlantFunctional schematic for selection. It is not a dimensional drawing or a confirmation of items included in the quotation.
Prepares the concrete at the equipment.
Transfers prepared concrete into the connected line.
Carries concrete to the planned receiving point.
| Configuration area | Reference scope | Options / confirmation |
|---|---|---|
| Core equipment | Concrete Mixer Pump and its published configuration. | Approve the exact model, component list and duty before order. |
| Supporting systems | Concrete source, delivery and placement interfaces. | Confirm what is supplied, optional or provided by the buyer. |
| Custom / private label | Custom configuration and branding discussions are supported. | Agree artwork, colours, markings, electrical requirements and documentation scope. |
Request dimensions, module weights, support layout, working clearances and utility connections for the selected configuration. Final transport and lifting plans follow the approved equipment scope.
Request Engineering DocumentsRequest available model-specific operation footage, factory inspection information and the proposed acceptance checklist. Agree the identification and records required for your procurement process.
Discuss Inspection RequirementsReview published model references before requesting the detailed technical pack.
Download CSV ↓