DJBT40-10-82 Configuration
The listed 60 m vertical and 250 m horizontal limits provide separate reference points for pipe-route assessment.
DJBT40-10-82 combines a 450 L mixer with 40 m³/h theoretical pump output. The source specifies a Weifang 82 kW engine and 10 MPa maximum concrete pressure.

Series rendering. Confirm DJBT40-10-82's appearance and included equipment in its proposal.
DJBT40-10-82 combines a 450 L mixer and a diesel-powered concrete pump in one equipment arrangement. Loading and mixing prepare the concrete; the pump then feeds the connected delivery line.
Consider it where the work location needs both concrete preparation and pipeline delivery. The 40 m³/h value is a theoretical pumping reference, not a guaranteed combined mixing-and-pumping production rate.
The listed 60 m vertical and 250 m horizontal limits provide separate reference points for pipe-route assessment.
At 5,300 kg published machine weight, lifting and transport can be discussed using a model-specific starting value.
Understand the role of each connection before building the equipment package.
INTERFACE 01 / Screw ConveyorIf mechanical powder feeding is proposed, its receiving connection must be engineered for the mixer arrangement. A plant screw is not automatically a plug-in accessory.
Define whether materials are loaded manually or through an approved feeding system.
INTERFACE 02 / Mobile Concrete Batching PlantA mobile plant with a separate pump is an alternative system architecture when the project needs a dedicated batching source.
This is an alternative to integrated mixing; do not add a plant as a presumed required component of DJBT40.
INTERFACE 03 / Trailer Concrete PumpA trailer concrete pump becomes a separate option when usable mixed concrete is already supplied by a plant, mixer or delivery vehicle.
Choose the supply method first; two pump types do not automatically form a series connection.
INTERFACE 04 / Spider BoomA separately supplied placing boom may distribute pumped concrete within its assessed support and working area.
Confirm combined pump duty, line connections, losses and boom support before selecting this arrangement.
Options and alternative architectures are identified in each explanation. This is not a pre-approved matched package. Final connections, duty and supplied components require a model-specific technical review.
Review My Equipment CombinationSeparate the key systems to see what each contributes to the operation.
DJBT40-10-82 functional separation illustration. Blocks identify subsystem roles; they do not reproduce the machine geometry, assembly sequence or fastening details. Request the approved model drawing for engineering use.
| Parameter | DJBT40-10-82 |
|---|---|
| Theoretical concrete pumping output | 40 m³/hr |
| Maximum concrete pumping pressure (MPa) | 10 |
| Main engine | Diesel engine: WEIFANG 82KW |
| Main oil pump | KAWASAKI 112 |
| Main oil cylinder diameter/stroke | Φ100/800 mm |
| Concrete cylinder diameter / stroke (mm) | Φ180/800 |
| Theoretical pump distance | Height: 60 m Length: 250 m |
| Hydraulic pump set | HUADE (CN) |
| Hydraulic valve set | TAIFENG (CN) |
| Lubricating system | Automatic hydraulic |
| Concrete mixer volume | 450L per tank |
| Max. Aggregate size | 35 mm |
| Aggregate lifting volume | 500L per hopper |
| Concrete slump | 160-220 mm |
| Controller | Wireless / Cabinet-buttons |
| Main electric components | CHINT (CN) |
| Machine weight | 5300 kg |
| Diameter of concrete pipe | Φ125 mm |
| Length of concrete pipe | 100 m |
Published EPDAS specifications are a reference for equipment selection. Final specifications and included equipment are confirmed in the quotation. Pump output is not mixer production output. Vertical and horizontal pumping distances are separate reference limits and are not achieved simultaneously; results depend on concrete and pipeline conditions.
Original EPDAS Technical Reference ↗| Selection reference | DJBT40-10-82 · This model | DJBT50-10-85 | DJBT30-08-76 |
|---|---|---|---|
| Theoretical concrete pumping output | 40 m³/hr | 48 m³/hr | 32 m³/hr |
| Maximum concrete pumping pressure (MPa) | 10 | 10 | 8 |
| Concrete mixer volume | 450L per tank | 450L per tank | 450L per tank |
| Main engine | Diesel engine: WEIFANG 82KW | Diesel engine: YUCHAI 85KW | Diesel engine: WEIFANG 76KW |
| Machine weight | 5300 kg | 5400 kg | 5200 kg |
Consider this configuration for integrated preparation and pumping where diesel power fits the site supply plan.
Material loading method, concrete recipe, slump and aggregate size.
Full pipeline profile, bends, elevation and the receiving point.
Cleaning provisions, crew access and diesel operating conditions.
Confirm core equipment, options, buyer-provided systems, transport modules, inspection documents and support responsibilities in the quotation.