PIPELINE CONCRETE DELIVERY

Trailer Concrete Pump

A trailer concrete pump receives concrete from a separate mixer, batching plant or truck mixer and transfers it through a pipeline. Compare electric HBT models with diesel DHBT models around output, pressure, power supply and delivery route.

EPDAS Trailer Concrete Pump
WHAT IS TRAILER CONCRETE PUMP?

A Separate Pipeline Concrete Delivery Machine

What Does It Do?

It receives concrete from a mixer, plant or truck and pumps it to the pour. It does not produce the concrete itself.

EQUIPMENT OVERVIEW

Keep The Concrete Moving

Theoretical pump output40–80 m³/h
Published pressure10–15.7 MPa
Power optionsElectric / Diesel

Images show an equipment configuration. Specifications and included equipment depend on the selected model and quotation.

CONFIGURE FOR THE WORK

Details That Make The Difference

  • HBT40S, HBT50S, HBT60S and HBT80S electric configurations
  • DHBT60 and DHBT80 diesel configurations with different pressure ratings
  • S-type distribution valve and 600 L hopper in published models
  • Φ125 mm delivery pipe reference across the listed range
  • Electric motor powers 45–110 kW; diesel engine powers 118–174 kW
PROJECT PLANNING

Applications To Discuss

Building work, civil construction and placements requiring a planned concrete pipeline.

Tell Us About Your Project

Required output, concrete mix, aggregate size, delivery height, horizontal distance and power supply.

EXPLORE BY MODEL

Choose Your Configuration

Open a model to explore its specific strengths, published configuration and project fit.

TECHNICAL SPECIFICATIONS

Compare The Details

Electric Trailer Concrete Pumps

Scroll horizontally to compare all specifications.

Trailer Concrete Pump — Electric trailer concrete pumps
ParameterHBT40S-10-45HBT50S-12-55HBT60S-13-90HBT80S-13-110
Theoretical max. discharging volume (m³/h)40506080
Theoretical max. delivery pressure (Mpa)101212.512.5
Delivery distance Vertical (m)120150180180
Delivery distance Horizontal (m)300350700700
Distribution valve typeS valveS valveS valveS valve
Hopper capacity (L)600600600600
Feeding height (mm)1400140014001400
Inner dia. of delivery pipe (mm)Φ125Φ125Φ125Φ125
Main motor power (Kw)455590110
Dimension (length ×width ×height) (mm)4970×1680×25805270×2000×18406170×1800×21006170×1930×2100
Overall weight (Kg)3200350051005200

Diesel Trailer Concrete Pumps

Scroll horizontally to compare all specifications.

Trailer Concrete Pump — Diesel trailer concrete pumps
ParameterDHBT60-13-118DHBT60-16-145DHBT80-13-145DHBT80-16-174
Max. Theoretic delivery volume (m³/h)60608080
Max. Theoretic delivery pressure (Mpa)12.515.712.515.7
Max. Theoretic delivery height (m)180250180250
Max. Theoretic delivery distance (m)70010007001000
Type of distribution valveS valveS valveS valveS valve
Hopper capacity (L)600600600600
Inner diameter of delivery pipe (mm)Φ125Φ125Φ125Ф125
Diesel engine power (Kw)118145145174
Max. Oil pressure of main system (MPa)32323232
Max. Oil pressure of mixing system (MPa)14141414
Dimension (length ×width ×height) (mm)6600×1930×21906600×1930×21906600×1930×21906600×1930×2190
Overall weight (Kg)5500600060006500

Published EPDAS specifications are a reference for equipment selection. Final specifications and included equipment are confirmed in the quotation. Maximum output, pressure, vertical height and horizontal distance are separate reference limits. They are not simultaneous guaranteed operating points; concrete properties and pipe layout affect performance.

EPDAS product reference
THE WORKING PROCESS

How It Works

01 /

Supply Suitable Concrete To The Hopper

02 /

Agitate And Feed The Pumping Cylinders

03 /

Pump Through The S-valve And Connected Line

04 /

Deliver To The Planned Placement Point

BEFORE YOU CHOOSE

Your Questions, Answered

Does a trailer concrete pump mix concrete?

No. It needs an external concrete supply, such as a batching plant, separate mixer or truck mixer. Match the supply rate to the intended pumping operation.

Should I choose diesel or electric?

Compare available site electricity, operating duty and movement between work areas. Confirm voltage and frequency for electric models and engine configuration for diesel models.

CONFIGURATION PLANNING

The Pump And The Supply Must Work Together

A Dependable Concrete Source

Match arrival and discharge of concrete with the intended pumping rate. Hopper supply interruptions affect delivery even when the pump has spare rated capacity.

Route Rather Than Distance Alone

A route combines elevation, pipe sections, bends and receiving conditions. Review the complete layout instead of adding maximum vertical and horizontal ratings.

Cleaning And Coordination

Agree how the line will be cleaned, where residue will be managed and how communication will work between the pump and placing area.

BUILD THE EQUIPMENT ARRANGEMENT

What Connects To Trailer Concrete Pump?

Distribute At The Pour

Consider a separate placing boom where its supported working envelope fits the application.

Explore Spider Boom
EQUIPMENT STRUCTURE & SUPPLY SCOPE

Define The Equipment You Are Buying

Functional schematic for selection. It is not a dimensional drawing or a confirmation of items included in the quotation.

01

Concrete Supply

An external mixer, plant or concrete delivery vehicle.

02

Pumping System

The selected concrete transfer unit.

03

Delivery Pipeline

Pipe route, bends and receiving position matched to the duty.

Configuration areaReference scopeOptions / confirmation
Core equipmentTrailer Concrete Pump and its published configuration.Approve the exact model, component list and duty before order.
Supporting systemsConcrete source, delivery and placement interfaces.Confirm what is supplied, optional or provided by the buyer.
Custom / private labelCustom configuration and branding discussions are supported.Agree artwork, colours, markings, electrical requirements and documentation scope.

Installation & Transport Pack

Request dimensions, module weights, support layout, working clearances and utility connections for the selected configuration. Final transport and lifting plans follow the approved equipment scope.

Request Engineering Documents

Inspection & Running Evidence

Request available model-specific operation footage, factory inspection information and the proposed acceptance checklist. Agree the identification and records required for your procurement process.

Discuss Inspection Requirements

Download Current Selection Data

Review published model references before requesting the detailed technical pack.