YHZM35 Configuration
The project arrangement links mobile drum production with separately deployed DHBT40 trailer concrete pumps.
The EPDAS Ghana pharmaceutical-facility report identifies YHZM35 as the mobile concrete production unit serving factory, office and internal-road construction areas. This page follows that case designation without assigning YHZM30 specifications to it.

Series rendering. Confirm YHZM35's appearance and included equipment in its proposal.
The Ghana report identifies this model as the production source for a pharmaceutical facility, without publishing a complete numeric model sheet.
Use the documented workflow to discuss a project configuration while requesting the current YHZM35 specification independently.
The project arrangement links mobile drum production with separately deployed DHBT40 trailer concrete pumps.
Its documented role covers several construction areas within one facility, providing a useful example of coordinated production and delivery planning.
Understand the role of each connection before building the equipment package.
INTERFACE 01 / Trailer Concrete PumpThe report connects this plant to two diesel DHBT40 units.
This is a documented project arrangement rather than a universal matched package.
INTERFACE 02 / Cement SiloThe case designation does not establish a silo capacity.
Ask which powder storage formed the proposed current configuration.
INTERFACE 03 / Screw ConveyorPowder conveyance details are not established by the project name.
Request actual endpoints and feed specifications for the equipment offered.
INTERFACE 04 / Concrete Boom PumpTruck-mounted placing would be a new alternative to the reported DHBT40 method.
Assess access and supply before applying it to another facility.
Options and alternative architectures are identified in each explanation. This is not a pre-approved matched package. Final connections, duty and supplied components require a model-specific technical review.
Review My Equipment CombinationSeparate the key systems to see what each contributes to the operation.
YHZM35 functional separation illustration. Blocks identify subsystem roles; they do not reproduce the machine geometry, assembly sequence or fastening details. Request the approved model drawing for engineering use.
| Parameter | YHZM35 |
|---|---|
| Documented plant family | Drum mobile concrete plant |
| Reported application | Ghana pharmaceutical infrastructure |
| Associated delivery equipment | DHBT40 trailer concrete pumps |
Published EPDAS specifications are a reference for equipment selection. Final specifications and included equipment are confirmed in the quotation.
Original EPDAS Technical Reference ↗| Comparison basis | YHZM35 · This model | YHZM30 | YHZM50 |
|---|---|---|---|
| Data basis | Ghana project designation | Published parameter table | Published parameter table |
| Mixing reference | Drum mobile plant; current sheet requested | JZM750 | JZM1000 |
| Published output | Not established by the case report | 20–30 m³/h | 40–50 m³/h |
| Reported relationship | YHZM35 supplied DHBT40 pumping in one facility | Configure transfer around 1.2 m source height | Three 6 m³ bins and 1.2 m outlet |
Review YHZM35 when a case-based production arrangement is helpful; request the current model sheet before comparing its numeric capacity with YHZM30.
Documented plant family: Drum mobile concrete plant
Reported application: Ghana pharmaceutical infrastructure
Associated delivery equipment: DHBT40 trailer concrete pumps
Confirm core equipment, options, buyer-provided systems, transport modules, inspection documents and support responsibilities in the quotation.