YHZM75 Configuration
Automatic PC control is listed alongside manual button operation at this point in the YHZM range.
YHZM75 combines the JZM1500 mixer with a 60–75 m³/h published output range. Three 6 m³ aggregate compartments accompany the larger drum mixing unit.

Series rendering. Confirm YHZM75's appearance and included equipment in its proposal.
The JZM1500 enlarges the mixing stage while the published storage stays at three 6 m³ aggregate compartments.
Examine replenishment frequency carefully when the 60–75 m³/h output band is relevant but aggregate stock format remains unchanged.
Automatic PC control is listed alongside manual button operation at this point in the YHZM range.
The optional powder-handling arrangement includes two screw conveyors and two cement hoppers in the source table.
Understand the role of each connection before building the equipment package.
INTERFACE 01 / Cement SiloIncreased mixing demand can shorten the powder replenishment interval.
Calculate cement use across the intended shift.
INTERFACE 02 / Screw ConveyorCheck dosing continuity for the larger drum unit.
Include conveyor feeding time and access to the powder connection.
INTERFACE 03 / Trailer Concrete PumpConcrete transfer still starts from the 1.2 m reference outlet.
Assess the receiving duty separately from the higher production band.
INTERFACE 04 / Concrete Boom PumpDelivery vehicles may connect this base to mobile boom placement.
Establish a workable low-level loading or approved transfer method first.
Options and alternative architectures are identified in each explanation. This is not a pre-approved matched package. Final connections, duty and supplied components require a model-specific technical review.
Review My Equipment CombinationSeparate the key systems to see what each contributes to the operation.
YHZM75 functional separation illustration. Blocks identify subsystem roles; they do not reproduce the machine geometry, assembly sequence or fastening details. Request the approved model drawing for engineering use.
| Parameter | YHZM75 |
|---|---|
| Concrete output capacity | 60~75m³/hr |
| Concrete output height (From the ground) | 1.2m |
| Central Mixer | JZM1500 |
| Aggregate bins | 3 bins × 6m³ |
| Aggregate feeding type | By belt |
| Aggregate weighing accuracy | ±2% |
| Water/Cement/Additive weighing accuracy | ±1% |
| Production control type | Manual by buttons + Auto by computer (PC) |
| Total power | ≈60kw |
| Screw conveyor | 2 × Φ219 × 12000mm |
| Cement hopper | 2 × 2 tons (≈1.5m³) |
| Cement silo | 100 tons |
Published EPDAS specifications are a reference for equipment selection. Final specifications and included equipment are confirmed in the quotation.
Original EPDAS Technical Reference ↗| Selection reference | YHZM75 · This model | YHZM50 | YHZM100 |
|---|---|---|---|
| Concrete output capacity | 60~75m³/hr | 40~50m³/hr | 80~100m³/hr |
| Central Mixer | JZM1500 | JZM1000 | JZM2000 |
| Concrete output height (From the ground) | 1.2m | 1.2m | 1.2m |
| Aggregate bins | 3 bins × 6m³ | 3 bins × 6m³ | 3 bins × 8m³ |
| Total power | ≈60kw | ≈45kw | ≈80kw |
Review YHZM75 for a production plan that favours drum mixing with computer-based batching control.
Concrete output capacity: 60~75m³/hr
Concrete output height (From the ground): 1.2m
Central Mixer: JZM1500
Confirm core equipment, options, buyer-provided systems, transport modules, inspection documents and support responsibilities in the quotation.