MCBP25 Configuration
Two 3 m³ bins and dual aggregate belts define the compact feeding configuration.
MCBP25 combines a JS500 mixer with 20–25 m³/h published output. Its 0.5 m discharge height calls for a concrete receiving arrangement designed around the low outlet.

Series rendering. Confirm MCBP25's appearance and included equipment in its proposal.
Two 3 m³ aggregate bins and a JS500 mixer form this low-discharge compact production arrangement.
Review the 20–25 m³/h band where the available footprint and engineered receiving method fit a compact project installation.
Two 3 m³ bins and dual aggregate belts define the compact feeding configuration.
The source pairs manual buttons with automatic touch-screen control at approximately 45 kW total power.
Understand the role of each connection before building the equipment package.
INTERFACE 01 / Trailer Concrete PumpThe 0.5 m concrete outlet is central to the pairing study.
Inspect hopper height and possible transfer arrangements before naming a pump.
INTERFACE 02 / Cement SiloStorage adds its own footprint beyond the compact mixing module.
Plan support and filling access in the overall site area.
INTERFACE 03 / Screw ConveyorPowder feeding must reach the approved weighing connection.
A short-looking plant does not establish a standard screw length.
INTERFACE 04 / Concrete Mixer PumpCompare integrated preparation if batching and pumping can be handled at one machine.
Distinguish its operating method from separate compact batching.
Options and alternative architectures are identified in each explanation. This is not a pre-approved matched package. Final connections, duty and supplied components require a model-specific technical review.
Review My Equipment CombinationSeparate the key systems to see what each contributes to the operation.
MCBP25 functional separation illustration. Blocks identify subsystem roles; they do not reproduce the machine geometry, assembly sequence or fastening details. Request the approved model drawing for engineering use.
| Parameter | MCBP25 |
|---|---|
| Concrete output capacity | 20~25m³/hr |
| Concrete output height (From the ground) | 0.5m |
| Central Mixer | JS500 |
| Aggregate bins | 2 bins × 3m³ |
| Aggregate feeding type | By 2 belts |
| Aggregate weighing accuracy | ±4% |
| Water/Additive weighing accuracy | ±2% |
| Cement weighing accuracy | ±1% |
| Production control type | Manual by buttons + Auto by touch screen |
| Total power | ≈45kw |
| Screw conveyor | Φ219 × 9000mm |
| Cement hopper | 2 tons (≈1.5m³) |
| Cement silo | 50 tons |
Published EPDAS specifications are a reference for equipment selection. Final specifications and included equipment are confirmed in the quotation.
Original EPDAS Technical Reference ↗| Selection reference | MCBP25 · This model | MCBP35 | MCBP50 |
|---|---|---|---|
| Concrete output capacity | 20~25m³/hr | 30~35m³/hr | 50~60m³/hr |
| Central Mixer | JS500 | JS750 | JS1000 |
| Concrete output height (From the ground) | 0.5m | 0.5m | 0.5m |
| Aggregate bins | 2 bins × 3m³ | 2 bins × 3m³ | 2 bins × 4m³ |
| Total power | ≈45kw | ≈57kw | ≈64kw |
Assess MCBP25 for a compact project layout where output and low-level transfer equipment are selected together.
Concrete output capacity: 20~25m³/hr
Concrete output height (From the ground): 0.5m
Central Mixer: JS500
Confirm core equipment, options, buyer-provided systems, transport modules, inspection documents and support responsibilities in the quotation.